WTG Project – Construction of 91 Wind Turbine Generators & 220kV Transmission Line

HAM
Specialized Infrastructure Solutions
Andhra Pradesh

The Construction of 91 Wind Turbine Generators (WTGs) along with the laying of a 54 km 220kV Single Circuit transmission line is being executed in Andhra Pradesh. The project received LOA on 23 March 2026 and is currently in the execution phase.

Latest Projects

Jam Khambhaliya Jamnagar Power Transmission Limited

Punjab 100 MW BESS Project

Una Bulk Drug Park Phase-I