Indore–Ujjain Greenfield Highway (4-Lane)

HAM
Highways & Expressways​
M.P
Construction of the 48.10 km, access-controlled 4-lane Indore–Ujjain Greenfield Highway in Madhya Pradesh under the Hybrid Annuity Mode (HAM). The Letter of Acceptance (LOA) was received on 27 December 2025, and the Appointed Date was declared as 6 July 2026. The project is currently under progress.

Latest Projects

Jam Khambhaliya Jamnagar Power Transmission Limited

Punjab 100 MW BESS Project

Una Bulk Drug Park Phase-I