Huri–Taliha NH-913 (Km 0–55.725)
EPC
Highways & Expressways
Arunachal Pradesh
Construction of an Intermediate Lane road from Km 0.00 to Km 55.725 of the Huri–Taliha section of NH-913 (Frontier Highway) on EPC mode in Arunachal Pradesh for the Ministry of Road Transport and Highways (MoRTH). The Letter of Acceptance (LOA) was received on 17 August 2026. The project is currently under work in progress, with a construction period of 36 months.