Danapur – Bihta
EPC
Elevated Roads
Punjab
Construction of a Four-Lane Elevated Corridor and at-grade improvements from Design Ch: 0+000 to Design Ch: 19+870 on the Danapur-Bihta section, including the provision of connectivity to the existing RoB near Danapur Station (0.231 km), 1.35 km ramps, and at-grade improvements to the four-lane section on the Danapur side. The project also involves the upgradation of the existing two-lane carriageway to a four-lane carriageway from Design Ch: 19+870 to Design Ch: 23+500 on the Bihta-Koilwar section, with a total length of 25.081 km, in Bihar under EPC Mode.
We are constructing the longest continuous flyover in India, stretching 14.5 km, making it the first and longest continuous flyover in the country. We achieved the first milestone for this project in a month.