Balance of Plant – 300.3 MW Hybrid (Wind) Power Project, Ralla

HAM
Specialized Infrastructure Solutions
Punjab

The Construction of Balance of Plant for the 300.3 MW Hybrid (Wind) Power Project at Ralla, including associated 220kV transmission line works, is underway. The LOA was issued on 23 March 2026 and the project is presently progressing as scheduled.

Latest Projects

Jam Khambhaliya Jamnagar Power Transmission Limited

Punjab 100 MW BESS Project

Una Bulk Drug Park Phase-I