Ambala–Chandigarh Spur Connectivity

HAM
Highways & Expressways​
Punjab

Construction of a 6-lane access-controlled spur connectivity between NH-205A and Zirakpur Bypass in Punjab is underway on Hybrid Annuity Mode. The LOA was issued on 23 March 2026 and the project is currently in progress.

Latest Projects

Jam Khambhaliya Jamnagar Power Transmission Limited

Punjab 100 MW BESS Project

Una Bulk Drug Park Phase-I