Moga – Makhu

EPC
Railway Overbridges
Punjab

Moga

Makhu

The project involves the rehabilitation and upgradation of the Moga (Lohara Chowk on NH-05) section, spanning from Design Ch. 0+000 (Existing Km 0+000) to Makhu (at the junction with NH-703A) at Design Ch. 33+611 (Existing Km 33+622), with a design length of 33.611 km.

This includes the construction of a Railway Overbridge (ROB) at LC 81-S/2 –E at Design Ch. 44+680 (Existing Km 44+680) to Khalra (up to the International Border) at Design Ch. 86+236 (Existing Km 86+203) with a design length of 41.556 km.

Another ROB at LC No. B/53 /E2 at Design Ch. 59+007, via Bhikhiwinf to two-lane road with a paved shoulder on NH-703B, covering a total project length of 75.167 km. This project was executed in Punjab under EPC mode.

The completion of two Railway Over Bridges marks a significant milestone in improving regional connectivity and ensuring the safety and efficiency of both road and rail traffic.

Latest Projects

Malout – Abohar

Ismailabad – Karnal Pehowa