Lada–Sarli NH-913 Intermediate Lane

EPC
Highways & Expressways
Arunachal Pradesh
Construction of an Intermediate Lane road from Km 85.60 to Km 168.00 of the Lada–Sarli section of NH-913 (Frontier Highway) on EPC mode in Arunachal Pradesh for the Ministry of Road Transport and Highways (MoRTH). The Letter of Acceptance (LOA) was received on 24 August 2026. The project is currently under work in progress, with a construction period of 48 months.

Latest Projects

Jam Khambhaliya Jamnagar Power Transmission Limited

Punjab 100 MW BESS Project

Una Bulk Drug Park Phase-I