Bile Migging NH-913 Package-2
EPC
Highways & Expressways
Arunachal Pradesh
Construction of an Intermediate Lane road from Km 17.812 to Km 55.377 (Package-2) of the Bile Migging section of NH-913 (Frontier Highway) on EPC mode in Arunachal Pradesh for the Ministry of Road Transport and Highways (MoRTH). The Letter of Acceptance (LOA) was received on 17 August 2026. The project is currently under work in progress, with a construction period of 48 months.