Balance of Plant – 300.3 MW Hybrid (Wind) Power Project, Ralla
HAM
Specialized Infrastructure Solutions
Punjab
The Construction of Balance of Plant for the 300.3 MW Hybrid (Wind) Power Project at Ralla, including associated 220kV transmission line works, is underway. The LOA was issued on 23 March 2026 and the project is presently progressing as scheduled.