Varanasi–Ranchi–Kolkata Greenfield Highway – Package 11

HAM
Highways & Expressways
Punjab

Construction of a 6-lane access-controlled Greenfield Varanasi–Ranchi–Kolkata Highway from Donoreshan village to the junction with NH-20 at Bongabar village, spanning Km 288.600 to Km 325.500 in Jharkhand, under the Bharatmala Pariyojana on a Hybrid Annuity Mode (HAM) basis. The Letter of Acceptance (LOA) was issued on 31 March 2023, and the Appointed Date was declared as 06 July 2026 by the National Highways Authority of India (NHAI). The project is currently under progress, with a construction period as specified in the project agreement.

Latest Projects

Jam Khambhaliya Jamnagar Power Transmission Limited

Punjab 100 MW BESS Project

Una Bulk Drug Park Phase-I