Kanpur MRTS Project
Item Rate
Metro
Haryana
Design and construction of an elevated viaduct and five elevated stations—Agriculture University Station, Vijay Nagar Chauraha Station, Shastri Chowk Station, Barra-7 Station, and Barra-8 Station.
This includes architectural finishing, electrical and mechanical work, and special spans extending from the end of the ramp after the Double Pulia Station to Barra-8 Station (chainage 3783.000m to 7528.566m), and from the end of the ramp in the Depot to Agriculture University Station from chainage (-)297.460m to (-)855.339m) on Corridor-2 of the Kanpur MRTS Project in Kanpur, Uttar Pradesh, India (KNPCC-12).
We have started the erection of the superstructure precast piercaps. We cast a standard U-girder measuring 28 meters in just 110 days, marking the fastest U-girder casting in India.