Bhubaneswar Metro

Item Rate
Metro
Punjab

Contract BBC-05 involves the part design and construction of an elevated viaduct and six elevated stations, including Nandan Vihar, Raghunathpur, Nandankanan Zoological Park, Barang Station, Phulapokhari, and Trisulia Square. The scope covers the section from Chainage 15095.240m to 26052.770m (excluding architectural finishing) and includes the ramp for depot entry, as part of the Bhubaneswar Metro project.

The LOI has been received and the contract agreement has been signed. Work is already in progress at the site.

Latest Projects

Ramban – Banihal

Ramban – Banihal